Islamabad Building Regulations, 1963
VERIFICATION OF BUILDING
LINES
FORM D
SCHEDULE No.1
To,
The Capital Development Authority,
Islamabad.
Dear Sir,
I hereby inform you that the first course of
plinth of my building on Plot No.............................. Street No....................
Sector ................................................ Islamabad has been
laid. You are, therefore, requested to depute your office to verify the building
line so as to enable me to carry on my building work.
Yours faithfully,
....................................................................
( Allottee)
Address ...........................................................
Dated....................................2010
CERTIFICATE OF ARCHITECT
Certified that the construction upto the plinth level on the Plot No............................................. Sector ...................... Islamabad is in accordance with the Islamabad Residential Sectors Zoning REgulations, 1967, and the Islamabad Building Regulations, 1963.
It is expressly certified that no construction has been made within the minimum open yards prescribed by the said Zoning Regulations.
1. .......................................................................
Signature
of Registered Architect/ Engineer
2.
.......................................................................
Name
in Block letters of Registered Architect/ Engineer.
3.
........................................................................
Number
of the Registered Architect/ Engineer